MACHLANDDAMM FLOOD PROTECTION Baulos 7, ST. NIKOLA, UPPER AUSTRIA
Olivia Schimek-Hickisch
As the final part of a huge Flood Protection Project with linear protection, this lot includes protective measures individually designed for 33 different objects.
Some buildings received new additions and attic extensions above the flood level (HQ-100) in order to substitute the building parts below. Subsequently the rooms under the flood line of HQ-100 can be left open and flooded.
Further measures as drainage, barricade against rising dampness and partly mobile flood protection elements.
Planning partners: DI Dr. Ulf Krückl, Perg Austria
Client: Machland-Damm GmbH
Categories: Building Redevelopment
Project Gallery

overall picture of flood

successful flood protection

Olivia Schimek-Hickisch AT
http://www.arch-schimek.at
Herrenstrasse 2 | 4020 Linz