INDOOR SWIMMINGPOOL BRAUNAU, UPPER AUSTRIA
Olivia Schimek-Hickisch
At the existing municipal indoor swimming pool a major extension and refurbishment was realised. This general retrofit included several additions, alterations and a thermical improvent of the complete building skin.
A non-swimmer-pool was installed, the sport pool renewed and a childrens` pool with water-games installed . The showers and restrooms were revamped completely, the wardrobes extended. The existing gallery provides a generous south oriented relaxation zone. The sauna-area with its six different sauna cabines, steam bath, wardrobes, restrooms, relaxing and recreational room was relocated to the top floor.
The exterior spaces were remodelled completely as well.
Planning partners: Architekt DI Harald Hickisch, FHP ZT Gmbh, Linz
Client: Municipality of Braunau
Categories: Sports and Recreational Activities
Project Gallery

Hallenbad Braunau

entry indoor pool

Olivia Schimek-Hickisch AT
http://www.arch-schimek.at
Herrenstrasse 2 | 4020 Linz